Power transformer, HV switchgear and protection — engineered to order and delivered turnkey.
• 36 – 170 kV • To order • FAT & witness tests • Turnkey
Above roughly 50 kV, projects move into HV (HTB) territory: power transformers, HV switchgear, protection and civil works, each studied case by case. These are not catalogue items — they are engineered to your single-line diagram, your DSO's prescriptions and your site constraints, then built, factory-tested (FAT) and delivered turnkey.
| Stage | Content | Indicative lead time |
|---|---|---|
| Study & sizing | single-line diagram, protection, civil works | 4 – 8 weeks |
| Manufacture & testing | power transformer, factory acceptance test (FAT) | per rating |
| Transport & commissioning | abnormal-load transport, erection, on-site tests | per project |
HV projects are handled on a study basis — schedule and pricing established case by case from your specification.
HV substations and power transformers are addressed on a study basis, typically from 36 kV up into the HV range. Each project is scoped against your single-line diagram and DSO requirements.
Yes — FAT in the factory is standard on power transformers, and independent witness testing (KEMA / TÜV) can be arranged. The test programme is agreed at quotation.
Yes — from study and manufacturing through abnormal-load transport, erection and on-site commissioning, with a single point of accountability. The exact scope is defined in the quotation.
Send your single-line diagram and specification — we come back with a schedule and a firm quotation.
Configure a quote →