Home / Products / Oil-immersed
Transformers · oil-immersed

Oil-immersed distribution transformer

Mineral oil or ester, from neighbourhood substations to industrial sites — the workhorse of distribution, and the core of our offer.

• 100 – 3,150 kVA  • MV / LV  • IEC / EN 60076  • Tier 2  • Delivered in 15–18 weeks

Oil-immersed transformer

What an oil-immersed transformer is for

The core and windings sit in a tank of insulating fluid — mineral oil or ester — which insulates and carries heat away to the radiators. It is the workhorse of distribution: excellent cooling, high overload capability, long service life, and the most economical choice at a given rating. It is the default for outdoor substations, industrial sites and grid connections where fire-safety constraints allow a liquid-filled unit.

Standard range · 20 kV / 410 V (extract)

PowerImpedanceLossesIndicative massIndicative footprint
250 kVA4 %Tier 2≈ 0.9 – 1.1 t≈ 1.35 × 0.90 m
630 kVA4 %Tier 2≈ 1.6 – 1.9 t≈ 1.60 × 1.00 m
1,000 kVA6 %Tier 2≈ 2.3 – 2.7 t≈ 1.80 × 1.10 m
1,600 kVA6 %Tier 2≈ 3.4 – 3.9 t≈ 2.00 × 1.20 m
2,500 kVA6 %Tier 2≈ 4.8 – 5.6 t≈ 2.30 × 1.40 m

Basis: mineral oil, ONAN, Dyn11, 50 Hz. Losses per EU Regulation 2019/1783 (Tier 2). Indicative pre-sizing values — exact figures depend on manufacturer and options, confirmed at quotation.

Dielectric: your choice

Mineral oil is the economical standard. Natural ester (FR3) and synthetic ester (MIDEL) raise the fire point and biodegradability — often specified for indoor vaults, environmentally sensitive sites and where local fire codes demand it. All three are quoted against your requirement.

Frequently asked

Oil or ester — how do I choose?

Mineral oil is the economical default outdoors. Ester is chosen where fire safety or environmental exposure matters — higher fire point, biodegradable. We quote both against your risk analysis.

What losses do you supply?

Tier 2 as the legal EU floor; reduced-loss designs on request where the total cost of ownership justifies them (heavily loaded, continuous sites). A routine test report evidences the actual losses.

Is it delivered ready for the grid connection?

Yes — supplied with routine test report per IEC/EN 60076, EU Declaration of Conformity and full documentation, so it drops into a NF C 13-100 delivery substation.

Ready to quote

Configure your oil-immersed transformer

The configurator collects exactly the fields that define your unit. First reply within 48 h.