MV delivery substation, packaged

Transformer, MV switchgear and LV board integrated — including prefabricated compact substations to NF C 13-100.

• MV up to ~36 kV  • NF C 13-100  • Prefabricated or in-building  • Delivered in 15–18 weeks

Prefabricated MV substation

A complete MV delivery substation

Beyond the transformer alone, a delivery substation is the point where your private installation connects to the public MV grid. We supply it as a package: MV switchgear, transformer, LV board, metering, protection and enclosure — designed to the French NF C 13-100 framework and the distributor's requirements. Two forms: a prefabricated compact substation (concrete monobloc, factory-tested) or a substation built inside a building.

Two typical architectures

ElementPrefabricated compactIn-building
Transformerup to ≈ 1,000 kVAup to 2,500 kVA and beyond
MV switchgear2 incomers + 1 protection (typical)per operating scheme
Enclosureconcrete monoblocmasonry / modular
MeteringLVLV or MV
FrameworkNF C 13-100NF C 13-100 / NF C 13-200
Delivered lead time15 to 18 weeksper project

Exact configuration depends on the DSO and the applicable NF text — confirmed at quotation, specifications validated with the factory.

Frequently asked

When do I need an MV connection rather than LV?

In practice, once demand exceeds what the local LV network can deliver (often around 250 kVA), the distributor directs you to an MV connection with a delivery substation. The threshold is set by the DSO at the connection-request stage.

Prefabricated or in-building — which is faster?

A prefabricated compact substation arrives factory-tested, which shortens site work; it suits ratings up to ≈ 1,000 kVA. Larger or bespoke schemes are built in-building. We quote the fitting option for your project.

Do you handle the DSO documentation?

We supply the equipment documentation — drawings, test reports, declarations — that feeds your connection file. The connection request itself follows the DSO's own calendar; starting it early is the best way to avoid a finished substation waiting for power.