Distribution and grid-connection transformers in volume, to standard specifications, with documented conformity and a lead time you can plan around.
• Volume orders • Tier 2 • Standard specifications • Documented conformity
A utility does not buy one transformer; it buys a series, to a fixed specification, repeatedly. Consistency between units matters more than a clever one-off design.
Every unit needs its routine test report and EU Declaration of Conformity — the file has to be complete, every time, without chasing.
Grid assets stay in service for decades. Loss levels and build quality are amortised over a very long horizon — which is where Tier 2 and beyond earn their place.
Rolling programmes need predictable lead times more than they need the lowest quote. A slot fixed at order is worth more than a promise.
| Parameter | Our approach |
|---|---|
| Ranges | Standardised 100 – 3,150 kVA, repeatable unit to unit |
| Losses | Tier 2 floor; reduced-loss designs on framework request |
| Documentation | Routine test report and EU Declaration of Conformity per unit |
| Framework orders | Volume terms and scheduled call-offs available |
| Delivered lead time | 15 to 18 weeks — production + shipping |
Indicative approach — the final specification follows your requirement, confirmed at quotation.
Oil-immersed →MV substation →HV substation →
Yes — standardised ranges are precisely what makes repeat orders efficient. Volume terms and scheduled call-offs are agreed at framework level; tell us the programme.
Routine test report per IEC/EN 60076 and the EU Declaration of Conformity, issued in our name as the manufacturer placing the product on the EU market, plus rating plate and operating documentation.
That is what reserved production slots are for: capacity is planned at our partner factories and call-offs are scheduled against your programme rather than queued behind other order books.
Send your standard specification and volumes — first reply within 48 h.
Configure a quote →