A dead transformer shuts a site down and costs money every day. Whether the unit has failed, is ageing, or has become undersized, we rebuild it from your rating plate, or size the uprate, compliant and delivered with no surprise at customs.
• 15–18 weeks • Single unit • Tier 2 / CE • French support
Replacement is almost never a planned project. Either the unit has failed (internal fault, overheating, insulation ageing) and the site is down; or it is nearing end of life and you act before the incident; or your load has grown and the unit is now too small. In all three the clock is running, and the replacement must slot into an installation that itself does not change.
From the rating plate and footprint dimensions we reconstruct the specification, power, voltages, vector group, connection, fittings, so the new unit is compatible with the existing substation. In most cases a firm quotation follows without a site visit.
A new unit placed on the EU market must meet Tier 2 ecodesign and carry CE marking, even when it replaces a decades-old machine, subject to the text in force. We confirm this before the order, not at customs.
Our standard lead time is 15 to 18 weeks delivered, and a single unit is a routine order, not an exception, which is precisely where large catalogue suppliers are slowest.
| Parameter | Our approach |
|---|---|
| Lead time | 15 to 18 weeks delivered; prioritised for a blocking failure |
| Quantity | Single unit or single substation, a routine case |
| Reconstruction | Characteristics rebuilt from the rating plate; footprint matched to the existing room |
| Compliance | New unit to Tier 2 (EU 548/2014) and CE, subject to the text in force |
| Technology | Oil-immersed or cast resin, chosen for the environment |
| Contact | Reply within 48 h, in English or French, from quote to delivery |
Indicative approach, the final specification follows your requirement, confirmed at quotation.
The simplest route: a clear photo of the rating plate of the unit to replace, plus a photo of the room or substation if possible. If the plate is unreadable, describe what you know (kVA, voltages, oil or dry) in the configurator or by e-mail. If only a fitting has failed (bushing, relay, gasket), a part replacement may be enough, see spare parts.
Oil-immersed →Cast resin (dry) →Spare parts →
Our standard lead time is 15 to 18 weeks, production and shipping included, customs clearance included. For a blocking failure, tell us: we prioritise and find the fastest route available.
Yes. From the rating plate and footprint dimensions, we reconstruct the characteristics (power, voltages, vector group, connection, fittings) for a replacement compatible with your existing substation.
Yes. A new unit placed on the EU market must meet Tier 2 ecodesign (EU Regulation 548/2014) and carry CE marking, even when it replaces an older model. We validate this upfront, subject to the text in force.
Yes. We produce single units as readily as batches: replacing one transformer or one substation is a routine case for us.
Send a photo of the rating plate or your characteristics, first reply within 48 h.
Configure a quote →