Home / Sectors / Battery storage (BESS)
Application · battery storage

Transformer for battery storage (BESS)

Battery storage imposes truly bidirectional flow and harmonic-rich converters: the transformer is specified for that duty from the start, not patched afterwards.

Bidirectional flowK-adaptedTier 2Delivered in 15–18 weeks
Factory-assembled e-house for transformer and medium-voltage interface integration on a BESS project

What changes with a BESS

A conventional distribution transformer is designed for downward flow and a roughly sinusoidal load. A battery system charges and discharges, the flow reverses several times a day, and the PCS converters inject harmonics that heat the windings beyond the apparent RMS current. The engineering answer: a K-adapted design (thermal oversizing of the windings), screens and vector group chosen for inverter duty, and endurance against repeated thermal cycling.

Tell us in your request: PCS rating and number of units, harmonic spectrum (THDi), cycling profile (cycles/day), dedicated or shared transformer, site constraints (outdoor, coastal, altitude).

Specification benchmarks (indicative)

ParameterTypical BESS range
Power630 – 3,150 kVA per conversion unit
Impedance6 – 8 % depending on PCS requirement
K-factorK4 – K13 depending on harmonic spectrum
Vector groupDyn11 (others per conversion scheme)
Dielectricmineral oil · ester (enhanced fire safety) · cast resin
Delivered lead time15 to 18 weeks, production + shipping

Indicative pre-sizing values, the final specification follows your requirement and the actual PCS duty, confirmed at quotation.

Frequently asked

Can a standard transformer feed a BESS?

Technically it will run, but it ages prematurely: converter harmonics create additional losses its thermal design never accounted for. A K-adapted design costs little at the design stage and avoids an early replacement.

One transformer per PCS?

Both architectures exist: one transformer per conversion unit, or a shared multi-winding unit. The choice follows the project's electrical scheme, tell us yours and we will quote both if useful.

Is ester mandatory for a battery site?

No, but it is often chosen: high fire point and biodegradability strengthen the fire-safety case for a storage site. Mineral oil, ester or cast resin, we quote against your risk analysis.

How it works

From enquiry to delivery, in 4 steps

1You describeConfigure your need or send your specification. First reply within 48 h.
2Firm quotationOur team prices it and returns a firm quote within 5 working days, no commitment.
3Build & QCBuilt under our brand, inspected in production, witness testing available.
4Delivery to siteDelivered in 15–18 weeks, delivered price transport included, full documentation.
Ready to quote

A BESS project with a specification?

Select “Storage / BESS” in the Application field of the configurator, or send your specification, first reply within 48 h.

Configure a quote →