Sourcing in China exempts you from nothing. Placing a transformer on the EU market means meeting all of the following, and as the brand, we carry the manufacturer's obligations.

For EU medium-voltage switchgear up to and including 24 kV, Regulation (EU) 2024/573 addresses putting into operation from 1 January 2026, with specified derogations. The breaking medium and insulation medium must both be checked against the project requirements. Article 13
In both cases, the manufacturer's obligations stay with us; only the logistics change.
For projects in France, our designs also align with the applicable NF standards (NF EN 60076, NF C 13-100 / 13-200) and DSO requirements (Enedis / RTE); see the French version for the full France-specific documentation. This page states general principles, not legal advice.
Yes, origin is not what determines market access. What matters is that the product meets EU requirements and that someone established in the chain carries the manufacturer's obligations: technical file, EU Declaration of Conformity, CE marking, Ecodesign Tier 2. That responsibility is ours, under our brand.
The party placing the product on the EU market under its own brand. A factory certificate documents the unit; it does not transfer legal responsibility. We issue the EU Declaration of Conformity in our own name, and we hold the certifications rather than relying on the factory's.
Tier 2 is the second, stricter loss level of the EU Ecodesign regulation for power transformers, the legal floor for placing a transformer on the EU market today. It caps no-load and load losses; compliance is evidenced by the routine test report, not by a claim.
Not by law, routine tests per IEC/EN 60076 are included on every unit with the report supplied. Independent witness testing is an option some buyers specify for critical projects or internal procurement rules; we arrange it when requested.
Routine test report, EU Declaration of Conformity, rating plate data, installation and operation documentation, the package your compliance file and your DSO connection file need.
Describe your project, we quote a unit built to clear EU customs and inspection.