Power transformer, HV switchgear and protection, engineered to order with agreed equipment and site interfaces.

Tell us the product, approximate rating and your e-mail. We will review the requirement and identify any missing information. For voltages, delivery country and project details, use the full configurator.
Above roughly 50 kV, projects move into HV (HTB) territory: power transformers, HV switchgear, protection and civil works, each studied case by case. These are not catalogue items, they are engineered to your single-line diagram, your DSO's prescriptions and your site constraints, then built, factory-tested (FAT) and delivered under the agreed scope.
| Stage | Content | Indicative lead time |
|---|---|---|
| Study & sizing | single-line diagram, protection, civil works | 4 – 8 weeks |
| Manufacture & testing | power transformer, factory acceptance test (FAT) | per rating |
| Transport & commissioning | abnormal-load transport, erection, on-site tests | per project |
HV projects are handled on a study basis, schedule and pricing established case by case from your specification.
HV substations and power transformers are addressed on a study basis, typically from 36 kV up into the HV range. Each project is scoped against your single-line diagram and DSO requirements.
Yes, FAT in the factory is standard on power transformers, and independent witness testing (KEMA / TÜV) can be arranged. The test programme is agreed at quotation.
The quotation identifies the equipment, interfaces and options. Installation, connection, site testing and commissioning are handled by a qualified local contractor when agreed for the project. Delivery to the agreed site can be quoted. The offer specifies the Incoterm, transport, insurance, import clearance, duties and taxes, unloading and site services.
| Scope | What the quotation needs to define |
|---|---|
| Enclosure | Concrete, metal or in-building arrangement is subject to the specification, manufacturing route and supporting evidence. A metal alternative needs the client’s approval. |
| Equipment and factory work | Transformer, switchgear, LV board, internal links and factory tests are itemised in the quotation. |
| Cable links between substations | Separate scope: route length, cable quantities per phase, conductor and screen ratings, fault current, clearing time, ducts and terminations must be checked against the interfaces at both ends. |
| Site work | Civil works, ducts, unloading, lifting, earthing, cable pulling, terminations, testing and commissioning are assigned explicitly to each party. |
| Documents and acceptance | Component reports do not by themselves demonstrate the complete assembly. The agreed dossier identifies applicable assembly verifications, drawings, routine tests and any type-test evidence. |
| Delivery and programme | Delivery point, Incoterm, import responsibilities and a project schedule are confirmed in writing. A generic transformer lead time does not establish a complete substation schedule. |
For EU MV switchgear up to and including 24 kV, the F-gas rules concern putting equipment into operation from 1 January 2026, with specified derogations. We study fluorinated-gas-free insulation with suitable switching technology. Vacuum interruption alone does not establish that insulation is SF6-free. Regulation (EU) 2024/573, Article 13.
Send your single-line diagram and specification, we come back with a schedule and a firm quotation.