End of life, failures, a site that outgrew its machine: a replacement is decided as much on the worksite as on the transformer. The method, from the nameplate to the removal of the old unit.

Nobody replaces a transformer "to see". Four situations dominate: end of life (a well-run transformer lives for decades, but the insulation ages inexorably), recurring failures that signal advanced ageing (see common failures), a power need that has outgrown the machine, and energy obsolescence: on a heavily loaded site, an old unit can lose in losses what a Tier 2 replacement would pay back within a few years.
The like-for-like reflex is reassuring but often sub-optimal: a replacement is the one chance to resize (the site has changed in twenty years), to move to today's loss levels, even to change technology, a cast resin dry-type where fire safety has grown in importance, an ester fluid where the environment demands it. The extra cost of thinking it through is zero: ask for both scenarios to be priced.
Everything starts with a sharp photo of the nameplate: power, voltages, vector group, impedance, year. Add three overview photos (footprint, connections, surroundings) and the dimensions of the pit or room. With that, a replacement can be priced without a visit; the special cases (civil works to redo, difficult access) show on the photos.
Our range lead times (15 to 18 weeks delivered) are made to be planned: the outage is set on the confirmed delivery date, not the other way round. For sites that cannot wait for a definitive machine after an incident, transitional solutions exist (rental unit, temporary sharing): raise it at enquiry stage, the arrangement takes preparing.
For replacement work, agree the removal and disposal route for the equipment, fluids and any known contaminants. Retain the treatment records. Any disposal service is specified in the offer.
General method; each project is confirmed against the site survey, the applicable rules and the operator's requirements.
In the vast majority of cases, yes: nameplate photo + overview photos + room dimensions are enough for a firm quotation. A visit is only needed for genuinely atypical access configurations.
Not always: at equal or close power, modern footprints are often compatible. A change of technology (oil-immersed to dry-type) or an uprating can require it; that shows up at study stage, never mid-worksite.
Contact us with the nameplate: we look at the replacement machine and transitional solutions in parallel. The worst option is waiting; every drifting week ends up in the final schedule.
For replacement work, agree the removal and disposal route for the equipment, fluids and any known contaminants. Retain the treatment records. Any disposal service is specified in the offer.